This is a real job. Change anything — watch the quote move.
Live demo · nothing to sign up for

Front Porch Steps Full Tear-Out and Rebuild

The quote
$0
How heavy is this job, really? — you know the site, the AI doesn't
Labor (person-hours) — the AI guessed, you decide
0 hrs
What the customer sees
Before
Before
After — AI
AI illustration of the projected result
And if it waits — two winters
AI projection
AI projection of how the area could look if the work is not done
An AI projection of one possible future condition — not a prediction or a guarantee. This is what your customer sees when you show them the cost of putting it off.
Scope of work
  • Break out and demo full 3-step concrete stair assembly — all three treads, risers, and side cheek walls are spalled through, hollow-sounding, with aggregate exposed and structural voids at riser faces; not patchable
  • Haul all concrete rubble off-site to licensed disposal facility
  • Set wood forms for new 3-step stair run matching existing tread depth and riser height to porch deck level
  • Place rebar grid in each tread and riser cavity for cold-climate durability
  • Pour and finish 3000 PSI air-entrained concrete; broom-finish tread surfaces for traction
  • Strip forms at cure, seal surfaces with concrete cure-and-seal
The "after" is an AI illustration, not a photograph of completed work. This is a real job run through ForeSite — the numbers move because you moved them.
Run your own job — first 3 free, no card ← back to foresitequotes.com